1. Does steel attract lightning ?

Answer: No, protection system transmits the lightning to land.

Answer: No, galvanized structural steel is used. Steel coated with galvanize doesnot corrode.

Answer: Yes, the most important precaution to be taken against earthquake is to lessen the weight of the building. Steel buildings are 5 to 10 times lighter than reinforced concrete buildings. Steel absorbs the earthquake energy to a great extend and saves you and your belongings.

Answer: Yes, fabricated load bearing members ensure high quality for reasonable prices, shorten the construction period, reduce the labor costs; steel is long-lasting.

Answer: No, it doesnot get bug-infested, doesnot deflect, wear off or burn. Galvanized steel doesnot corrode.

Answer: It depends on the project selected, however it is more cost efficient than a reinforced concrete house which is the same size and of the same quality.

Answer: It takes 4 to 8 weeks depending on the size of the building after the foundations are completed.

Answer: Mechanical and electric installation pipes are mounted in the walls and ceilings on the spots that are identified at the stage project.

Answer: Only non-load bearing walls can be changed with the approval of the engineer.

Answer: It is not possible to add a new floor to a completed and delivered building.

Answer: Yes, insulation materials are selected according to the climate conditions of the location of the house.

Answer: Yes, when necessary precautions to protect the steel load bearing system are taken, fireplace and barbeque can be installed.

Answer: No. Various architectural designs can be easily implemented. You can either select among existing projects or request a special architectural project for yourself.

Answer: The most suitable and cost efficient solutions are found in 1, 2 or 3 storey houses. Though we construct up to Ground + 4 Floors.